Thursday, April 30, 2009

Bathroom Floor


The first floor bathroom floor is down, the same tiles, just a bit smaller are going on the wall for the shower enclosure. Then its just a case of bolting in the shower screen and basin and this bathroom is done.
The second floor is just behind, all the tiling, floor and shower should be done today.
The plumber should finish on Saturday then we just have to wait a coupel of days before we can use it......
Ed

No comments: