Thursday, April 30, 2009

Bathroom Floor


The first floor bathroom floor is down, the same tiles, just a bit smaller are going on the wall for the shower enclosure. Then its just a case of bolting in the shower screen and basin and this bathroom is done.
The second floor is just behind, all the tiling, floor and shower should be done today.
The plumber should finish on Saturday then we just have to wait a coupel of days before we can use it......
Ed

Sunday, April 26, 2009

Shower

Here you can see the controls and the valve to which the shower head will be attached. The wall will be aquapanelled and tiled this week. the shower will be all finished with the rest of the second fix before next weekend.

Ed

Bathroom Ceiling

The ceiling is finished and the lights work! The plumber has done the first fix in here, the walls and floor are about to be tiled and the second fix will be done before next weekend.

Ed

Tuesday, April 21, 2009

1st Floor Bathroom

So far - basin out, floor up and pipework removed

The picture is a bit blury but the shower tray is in with some new pipework.

Ed

2nd Floor Bathroom - so far!



So far - Bath out, bidet out, radiator out, lots of pipework out.
All to be replaced in the coming week with a roll top bath, shower, basin & pedastal and heated towel rail.

Emma's Basin


Monday, April 13, 2009

Finishing the walls


Emma has been sanding down her plastering - a great finish, ready to be painted now!
Ted

Postman Pat came to help aswell!


Bathroom Ceilings - Easter Weekend




I spent most fo the weekend finishing off the two bathroom ceilings - here's me after putting the first piece of board up, and the finished effort.
Ed