Monday, August 10, 2009

Wallpapering underway

Emma got the wallpapering started in the top loo started at the weekend. We also replaced part of the mechanism in the loo so now the water stops filling when it should rather than overflowing!

Kitchen - almost there......


We got the wall units up at the weekend. The units have come from eBay and the green shed at Timberhonger (but formerly from Ali and Jo's house in London!) We just need to buy a couple of doors, fit them, grout the tiles and fit the kick board and its there. Fully fitted by us.

Friday, August 7, 2009

The 'White' House - now in daylight


Even better in daylight.

Thursday, August 6, 2009

Back of the 'White' House

Thanks to Benjie we had the whole of the back of the house painted yesterday - makes the house look even bigger and will shock the neighbours when they get back from their holidays!

I'll take a picture in daylight and post it soon.

Kitchen

Sink at the far end, oven in place and the rest of the lower units are in with the work top on and secured - all finished before Mum got here last weekend. the wall units are going up this weekend - quite a change from the table for a worktop and a few plastic boxes for storage last week!

The day before The second floor bathroom shower was finished - a picture will go on tomorrow.

Kitchen - Plumbing


The sink and units went in and here the hot and cold supply are being connected to the taps


Put a new cold water supply in - this is Emma's plumbing - from the old steel pipe down on copper with a stop gate and then onto flexible plastic pipe.



We had to remove the old cold water plumbing