Tuesday, November 25, 2008

Re-Wiring Underway



The attic and second floor have been ripped apart today on the first day of the re-wire.

The house is being totally re-wired and by the end we'll be running on 40amps, rather than 6 or 10 amps at the moment. Oscar, the electrician, thinks he'll be finished by the weekend.

Sunday, November 23, 2008

Sunday Update - Stud Wall Finished


Today we finished the stud wall that now blocks the doorway between bedrooms 3 and 4.

Spent the rest of the day ripping up carpets, painting the bathroom floor and getting ready for Oscar, the electrician, who starts on Tuesday.

Saturday, November 22, 2008

Stud Wall


We're about half way through filling in the doorway between bedrooms 3 and 4.
Just the noggins, insulation and plasterboard to go!
Thanks to mum for my black and decker workmate

Snow in Brussels


Just as well we switched the boiler on this morning - the snow arrived at lunchtime ish

We have heating and hot water

Having spent an agonising two weeks with out gleeming Veissmann Vitodens 200-W waiting to go today we finally managed to have the 'great switch on.'

Almost a Flood!

Last Sunday night we woke up to hear the cellar filling with water! Even though the mains stop-cock came to the rescue we had call on Wayne, our plumber, to fit this Honeywell pressure valve.

Wednesday, November 12, 2008

Plumbing!!




After many hours of trying to figure out why nothing will go down our kitchen sink and half a bottle of acid later Ed managed to remove the old plumbing.


For a bargain price of €12 I replumbed the sink on Monday - and to my surprise it actually now works!!